Burnt Store Road-Middle Segment

Lee County, FL

DJI_0615.JPG
YEAR
2019
SIZE OF PROJECT
0.9 Miles
CLIENT
Lee County BOCC 

This project took the existing 0.9-mile stretch of two-lane undivided roadway configuration and upgraded it to a four-lane divided roadway configuration from NW 4th Terrace to NW 9th Terrace. Included in this project was a 195’ dual span bridge over the Hermosa Canal founded on 24” square concrete piles. In addition to the new roadway and bridge construction, the project included the milling and resurfacing of the existing roadway, the construction of a 10’ wide asphalt path, and the installation of steel utility casings for future use by the City of Cape Coral.

Wright Construction Group, Inc. Logo

CGC 053444

Headquarters
5811 Youngquist Road
Fort Myers, FL 33912

Downtown Fort Myers

1821 Victoria Avenue

Fort Myers, FL 33901

Office Hours

Monday to Friday

8:00 am to 5:00 pm

Contact Us

239.481.5000

  • Facebook
  • LinkedIn
  • Instagram
  • youtube
EventPhotoFull_2024 IA Logo_100724-083810.png
Asset 3_3x.png
thumbnail_BestPlacesWork_color-2025-2.jpg
Procore Logo
bottom of page