top of page

FGCU SoVi Boardwalk

Lee County, FL

IMG_0708.HEIC
YEAR
2024
SIZE OF PROJECT
23,668 SF
CLIENT
Florida Gulf Coast University

Design build of a 23,668 SF timber boardwalk through an undeveloped cypress preserve on the FGCU campus to connect the South Village Dorms to the Main Campus. Scopes of work for this project included engineering/design, clearing and grubbing of a cypress wetland, timber pile installation, large format timber framing, composite decking installation, composite handrail installation, form and pour concrete sidewalks, and installation of lighting/electrical components.

bottom of page