San Carlos Fire Station 55
Fort Myers, FL

YEAR
2024
SIZE OF PROJECT
6,579 SF
CLIENT
San Carlos Fire Protection and Rescue District
Wright Construction acted as construction manager working for the owner in conjunction with the design team. The project scope included the Construction of a new 6,579 SF fire station with a 572 SF mezzanine within the apparatus bay. Construction consisted of CMU walls with structural steel joists in the living quarters and pre- engineered metal building columns and roof framing in the apparatus bay. The project included 5 bunk rooms, 1 Lieutenant office, 3 bathrooms, kitchen, day room and gym. The exterior of the building included brick accents and stucco. Also included in the project were new concrete paved driveways and parking areas, stormwater retention/ control system as well as all required utility connections and services.